Medical Device Research & Development Facility

Location:
Berks County, PA

Norwood is currently serving as construction manager for a new R&D center on behalf of a global provider of medical technologies. The 63,000 square foot precast and glass building will house R&D Lab and Testing space separated into 15 lab units. It will feature a VFD exhaust system and a Class I, Division I Classified Explosion Proof Heptane/Wash Room. The remaining space consists of offices and a Design, Engineering, Tool/Machine Shop that supports production facilities around the world. The area was designed to optimize flexibility, allowing equipment to be relocated as needs change over time. An overhead track electric busway offers flexible power distribution. The building also includes at 350KW Generator, 20 Ton Process Chiller, DX AHUs, Humidification, and Hot Water Hydronic System.